Falmouth Wastewater Treatment Facility Wind Turbine Demolition

The scope of work includes the demolition of two (2) Vestas 1.65-megawatt wind turbines, including: clearing and grubbing; capping and proper disconnection of electrical interconnection, including transformers, low-, medium-, and high-voltage wiring, SCADA, communications and metering system; demolition of the wind turbines, disposal or recycling of all demolished system components and debris, site restoration, and all other ancillary activities required to complete the project.

Status

Bidding Closed

Prebid Date 3/23/22 10:00am
Bid Date 4/14/22 2:00pm

Company & Contacts

Weston & Sampson
Lee Koska  
9788189212

Location

154 Blacksmith Shop Road

= BID DATES =

● Non Mandatory Prebid on 03/23/22 at 10:00 AM.

● All Bids Due on 04/14/22 at 2:00 PM.

= PURCHASE & SHIPPING INFO =


For Printed Sets, NON-REFUNDABLE checks should be made out to Accent Printing. Complete sets only.

Printed sets can be picked up at Accent Printing, 99 Chelmsford Road, (Rear #13) No. Billerica 01862 after an order is placed.

Shipping via UPS is additional.