Marion Town Hall First Floor HVAC Upgrade project

This project shall consist of the installation of a new variable refrigerant flow (VRF) system complete with all associated controls, refrigeration piping and ventilation ductwork. The project will also include the installation of new energy recovery units and associated supply and exhaust ductwork to provide code required ventilation.
Addendums (click to expand/collapse)
This is available for download to registered users. Log in now
Name Date Size
Addendum No. 1 Marion Town Hall First Floor HVAC Upgrade 121321 12/14/2021 1.4 MB
Addendum No. 2 Marion Town Hall First Floor HVAC Upgrade 122221 12/21/2021 250.3 KB