Peabody - Diesel Building Window Wall Replacement

Removal of existing windows and a clerestory glazed wall and installation of translucent panels in the same existing masonry openings. There are asbestos containing materials as indicated in the specifications. The building is unoccupied.
Specs (click to expand/collapse)