Winchester - Project 10 - Muraco School Culverts
The Town of Winchester’s Aberjona River Flood Mitigation Program (FMP) ‘Project 10’ consists of the installation of two 8-foot diameter culverts adjacent to the two existing stone box culverts conveying the Aberjona River under the Massachusetts Bay Transportation Authority railroad ROW located northwest of Muraco Elementary School in Winchester, Massachusetts. The additional culverts will increase the flow capacity within this reach of the Aberjona River.
Status
Bidding Closed
Prebid Date | 6/13/24 11:00am |
Bid Date | 7/9/24 10:00am |
Company & Contacts
Town of Winchester
Margaret White
781-721-7120
Location
33 Bates Road, Winchester, MA