Winchester - Project 10 - Muraco School Culverts

The Town of Winchester’s Aberjona River Flood Mitigation Program (FMP) ‘Project 10’ consists of the installation of two 8-foot diameter culverts adjacent to the two existing stone box culverts conveying the Aberjona River under the Massachusetts Bay Transportation Authority railroad ROW located northwest of Muraco Elementary School in Winchester, Massachusetts. The additional culverts will increase the flow capacity within this reach of the Aberjona River.

Status

Bidding Closed

Prebid Date6/13/24 11:00am

Bid Date7/9/24 10:00am

Company & Contacts

Town of Winchester
Margaret White  
781-721-7120

Location

33 Bates Road, Winchester, MA

= BID DATES =

Prebid on 06/13/24 at 11:00 AM.

All Bids Due on 07/09/24 at 10:00 AM.


= PURCHASE & SHIPPING INFO =

For Printed Sets, NON-REFUNDABLE checks should be made out to Accent Printing. Complete sets only.

Printed sets can be picked up at Accent Printing, 99 Chelmsford Road, (Rear #13) No. Billerica 01862 after an order is placed.

Shipping via UPS is additional.