Falmouth Wastewater Treatment Facility Wind Turbine Demolition

The scope of work includes the demolition of two (2) Vestas 1.65-megawatt wind turbines, including: clearing and grubbing; capping and proper disconnection of electrical interconnection, including transformers, low-, medium-, and high-voltage wiring, SCADA, communications and metering system; demolition of the wind turbines, disposal or recycling of all demolished system components and debris, site restoration, and all other ancillary activities required to complete the project.
Addendums (click to expand/collapse)
This is available for download to registered users. Log in now
Name Date Size
Draft Addendum No. 2 4/7/2022 2.5 MB
Falmouth Wind Turbine - Addendum No. 1 3/25/2022 107.0 KB
Falmouth Wind Turbine Demolition - Bid Tabulation 4/15/2022 33.2 KB