Winchester - North Reservoir Spillway Replacement
The North Reservoir Spillway Replacement Project includes the replacement of the existing 22-feet long by 2-feet high concrete spillway with a new cast-in-place 22-feet long by 2.5-feet high concrete spillway and operable 3-feet wide aluminum slide gate.
Status
Bidding Closed
Prebid Date9/21/21 11:00am
Bid Date10/7/21 10:00am
Company & Contacts
Town of Winchester
Luke Boucher
617-607-6272
Location
Middlesex Fells Reservation, Winchester, MA