Fall River - City of Fall River Quequechan Rail Trail Westport Extension

The work under the Contract includes removal of existing railroad tracks and ties, construction of a 10-foot wide paved path, extending from the existing Quequechan Rail Trail terminus, approximately 550-feet to the town line of Westport, mill and overlay of existing path within the project limits, loam and seeding, modified rockfill installation, and other miscellaneous items of work.

Status

Bidding Closed

Prebid Date8/30/22 1:30pm

Bid Date9/16/22 2:00pm

Company & Contacts

VHB
Shawn Giatas  
617-607-1594

Location

Fall River

= BID DATES =

Virtual Prebid on 08/30/22 at 1:30 PM.

All Bids Due on 09/16/22 at 2:00 PM.



= PURCHASE & SHIPPING INFO =

For Printed Sets, NON-REFUNDABLE checks should be made out to Accent Printing. Complete sets only.

Printed sets can be picked up at Accent Printing, 99 Chelmsford Road, (Rear #13) No. Billerica 01862 after an order is placed.

Shipping via UPS is additional.